36 • AS/NZS 3010: 2005 is still the listed standard schedule 2 of the Electrical Safety Regulation 2010: (Revised July 2022) • AS/NZS 3010: 2017 has not been put into law at the time of printing this document • NOTE: See page 95 for Mains Off Generator Installation FAQ Mains Off Generator Switches to AS/NZS 3010: 2005 Single Phase
RkJQdWJsaXNoZXIy MTAxNzE=